• 19 - 23 Adams St, Mildura VIC 3500
  • Call Us: (03) 5023 2884
  • Week Days: 7am – 5pm
  • Saturday & Sunday: CLOSED

Projects

Gannawarra Solar Farm

Client: Gannawarra Solar Farm
Project: Gannawara - Installation of Solar
Services: Fabrication Site Work Labour Hire
Process: Installation
Industry: Renewal Energy

The Gannawarra Energy Storage Project will extend the performance of the Gunnawarra Solar Farm to a combined 50MWac solar farm with 25MWac/50MWh of battery storage.

Installed Capacity
60.0 MW DC

Commercial Operations Date
March 2018

Generation
116,000 MWh per annum

Households powered
25,000